THE OIL AND GAS ACT
(C.C.S.M. c. 034
)

Regulation 111/94
Registered
June 6, 1994

The Drilling and Production
Regulations 111/94 as
amended by
 M.R. 51/95
 M.R. 145/98
 M.R. 116/2001

Regulations
gold dotCrown Disposition Regulation
gold dotCrown Royalty & Incentives Regulation
gold dotDrilling & Production Regulation
gold dotGeophysical Regulation
gold dotLandspraying While Drilling (LWD) Guidelines
gold dotPetroleum Fiscal Regime - Incentive Program
gold dotOil & Gas Production Tax Act Regulation
Acts
gold dot
Bill 21 - The Oil and Gas Amendment and
Oil and Gas Production Tax Amendment Act

gold dotOrders under The Oil and Gas Act
gold dotThe Oil and Gas Act
gold dotOil and Gas Production Tax Act

SCHEDULE F
(Section 14)
Off-Target Penalty Factors
Drilling and Production Regulation Table of Contents

1. Where the minister has not varied the size and shape of a spacing unit under section 102 of the Act, the off-target penalty is determined:

(a) for a well producing from a pre-Mississippian pool or a horizontal well, by reference to Diagram A;

(b) in the case of any other well, by reference to Diagram B.

DIAGRAM A

Diagram A


DIAGRAM B

Diagram B

Class 2
Class 3
BOP Class 2 BOP Class 3
System
BOPA 4

SCHEDULE G
(Subsection 85.2(1))
Consentrations of Hydrogen Sulphide and Sulphur Dioxide

1. The concentration of hydrogen sulphide beyond a well or battery site shall not exceed either of the following levels:

(a)  one hour average - 15 micrograms per cubic metre/11 parts per billion;

(b) 24 hour average - 5 micrograms per cubic metre/4 parts per billion.

2.  The concentration of sulphur dioxide beyond a well or battery site shall not exceed either of the following levels:

(a) one hour average - 900 micrograms per cubic metre/0.34 parts per million;

(b) 24 hour average - 300 micrograms per cubic metre/0.11 parts per million.